Misc. Repairs To Aquatic Center, Bldg 641

Fort Eustis, VA

  • Fort Eustis Aquatic Center
  • Fort Eustis Aquatic Center
  • Fort Eustis Aquatic Center

This project consisted of the repair and upgrade of the Rain Drop Fountain, the replacement of the existing Hydronic Boiler, and the repair to the damaged exterior soffit. After further investigation, Homeland also found that the lap pool hydraulic platform required replacement, as well as the lap pool needed to be repaired and repainted. The lighting systems in the lap pool area were replaced with new lights and fixtures. JP Harvey Engineering Solutions performed the design/engineering functions.