Design/Build for BFC Piers/Site Modifications

Yorktown, VA

  • USCG TRACEN, Yorktown, VA - Design/Build for BFC Piers/Site Modifications, Building 183, USCG TRACEN, Yorktown, Virginia
  • USCG TRACEN, Yorktown, VA - Design/Build for BFC Piers/Site Modifications, Building 183, USCG TRACEN, Yorktown, Virginia
  • USCG TRACEN, Yorktown, VA - Design/Build for BFC Piers/Site Modifications, Building 183, USCG TRACEN, Yorktown, Virginia

This contract included the design and extending the existing wood Finger Pier Nos. 3, 4 and 5, (60" on Finger Pier No. 5, 20" on Finger Pier Nos. 3 and 4) providing a new wood fueling pier (14" x 50") at the end of extended Finger Pier No. 5, providing new cleats on the finger pier extensions and fueling pier, replacing the existing gasoline fueling system by installing a new underground tank (10,000 gallons), buried fuel lines, fuel lines to the Fueling Pier, two (2) new marine grade Gasoline Dispensers on the Fuel Pier, plus removal of the existing above ground gasoline tank (2,000 gallons), buried and above ground fuel lines from the tank to the gasoline dispenser located at the shore line, removal of the existing gasoline dispenser, and all other mechanical and electrical items related to the existing gasoline fuel system. An existing Diesel Fuel dispenser it to be relocated from the Main Access Pier to the new Fuel Pier with the existing diesel fuel lines being extended to the relocated diesel fuel dispenser. Also included is associated electrical work with the new gasoline fueling system, and providing electrical shore ties (60 Amp), receptacles and lights on the extended finger piers and fuel pier. Installation of new compressed air connections and water hose bibs (extending existing piping) on the extended finger piers.